Hammond-Henry Hospital

Brad's Blog

Apr 3

Written by: Brad Solberg
4/3/2012 9:16 AM  RssIcon



Pictured above is the south side of the new construction featuring the curved dining room.  To the right is the hallway that will connect the north end of the main hallway to the newly-constructed south hallway that joins the new long term care facility.  Approximately 50 feet of the hallway must still be built after further progress is made with the internal construction.
The west office building (previous skilled and extended care wing) was finally approved for occupancy the final week of February.  Dr. Atwell is in his new office suite located on the second floor.  Also on the second floor are the sleep disorder center, human resources, accounting, patient accounts, quality management and administration.
The first floor will soon be home to Dr. Kumar Bobba, cardiologist and Dr. David Lang, OB/GYN.  Audiology Associates is already moved into their new offices on the first floor.  Quad City Kidney Center construction is not complete on the south side of the same building.
Wayfinding continues to be a challenge, but temporary signage and a well-informed volunteer contingency are making sure people get to their intended destination!

Tags:
Categories:
Location: Blogs Parent Separator Brad Solberg

Your name:
Title:
Comment:
Security Code
CAPTCHA image
Enter the code shown above in the box below
Add Comment   Cancel